top of page

Sunday May 27th Trail Build


Trail Build/Maintenance Day

DATE & TIME: 8:30am, Sunday 27th May 2018

REGISTRATION: Online registration will be posted soon, however you're more than welcome to turn up on the day and sign in there.

MEETING: Parks Vic Depot (Just above Skills Park)

WORKS: We will be working on Lower Buckle trail trying to tick of 13 major features/sections. A lot of this is replacing wooden features with rock, but will also require some drainage. A large amount of the preparation will be completed the day prior, however a machine will still be used on the day.

BRING:

Water, food, shovel (if you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather.

Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc). If you have any questions, please ask away.

BBQ and cold drinks provided for free to volunteers at the end of the build.

BYO food if you have any special food requirements.

Builds usually run for 4-6 hours.

If you need to leave early or are arriving later in the day, please message me on this forum or contact us via our contact form at www.lysterfieldmtb.com

Hope to see you there. Cheers.


bottom of page