top of page

APRIL - TRAIL BUILD DAY


Trail Build/Maintenance Day DATE & TIME: 8:30am, Sunday 22nd April 2018 MEETING: Parks Vic Depot (Just above Skills Park)

REGISTER HERE (However you're more than welcome to turn up on the day and sign in there):

https://www.parkconnect.vic.gov.au/Volunteer/public-planned-activity/?id=0b3fde18-f533-e811-bbd4-0003ff6f9fbe WORKS: We will be improving Redgum trail by re-aligning one end of the trail to improve the water flow and allow for the drainage to be controlled more sustainably. We will also be closing off the old trail line with large rocks, logs and mulch. BRING: Water, food, shovel (if you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather. Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc). If you have any questions, please ask away. BBQ and cold drinks provided for free to volunteers at the end of the build. BYO food if you have any special food requirements. Builds usually run for 5 hours. If you need to leave early or are arriving later in the day, please message me on this forum or contact us via our contact form at www.lysterfieldmtb.com Hope to see you there. Cheers.


bottom of page