top of page

Trail Build Day 12th August


Trail Build/Maintenance Day

DATE & TIME: 8:00am, Saturday 12th August 2017

MEETING: Parks Vic Depot (Just above Skills Park)

WORKS: We will be working on Lower Buckle clearing a lot of drains and making the trail less waterlogged. We will also replace the wooden features where possible, block of B-lines and trim some shrubs that are blocking line of sight.

BRING: Water, food, shovel (if you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather.

DO NOT BRING ANY POWER/ELECTRONIC/MACHINERY/TOOLS. We do not require it and have strict processes for use of these types of tools.

Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc).

If you have any questions, please ask away. BBQ and cold drinks provided for free to volunteers at the end of the build.

BYO food if you have any special food requirements.

Builds usually run from 8am-1pm. If you need to leave early or are arriving later in the day, please message me on this forum or contact us via our contact form at www.lysterfieldmtb.com

Hope to see you there. Cheers.


bottom of page