top of page

Trail Build Day - Dog Pound Trail


First build for 2017! Attend the build to receive good fortune for the rest of your rides throughout the year Trail Build/Maintenance Day DATE & TIME: 8:00am, Saturday 21st January 2017 MEETING: Parks Vic Depot (Just above Skills Park) WORKS: We will be working on Dog Pound Trail (the one way descent trail) replacing a log drop with rock, improving a jump, narrowing the trail with a lot of mulch, improving drainage the whole way down and also improving the corner which has turned into a sand pit. A fair amount of material will be being moved with wheelbarrows. BRING: Water, food, shovel (we do have some in the PV trailer), good shoes (preferably steel capped) and appropriate clothing for weather. Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc). If you have any questions, please ask away. BBQ and cold drinks provided for free to volunteers at the end of the build. BYO food if you have any special food requirements. Hope to see you there. Cheers. Forum Link: http://ldtr.org/forum/index.php?topic=1914.msg20318#msg20318


bottom of page