Summary: Trail Build October

An amazing effort by our volunteer trail builders. 11 volunteers worked on Farm tail and Lower Buckle switch-back climb from 8:30am to 1:30pm, contributing over 55 hours (excluding admin work). Here's what we did..... -> Drainage was completed along Farm trail and Switch-back climb of Lower Buckle. Some of these existing drains were severely blocked up and needing quite a lot of attention. -> Additional drainage paths were created to keep the trails fully drained during all weather conditions. -> Maintenance of existing trail features were carried out to improve the ride conditions. -> Few reverse grade drains were created to drain the water away from the trails. -> Existing berms were mai